ERP-Service

JSC “KazMunaiGas Trading House” project

Duration:

Introduction into the operation mode (2006 – 2008)

Maintenance and improvements (2008 – 2009)

Role in the project:

General Contractor

Functionality:

Finance, Material Management, Controlling, Sales, Asset Management, Contract Monitoring, Personnel Management, Real-Time Accounting of Oil and Oil and Gas Derived Products (Is Oil Downstream, TSW, MAD-pricing)

Project geography:

Astana City

JSC “KazMunaiGas Trading House”

JSC “KazMunaiGas Trading House”
1, Turan, Astana

Main activities:
Sales of oil, oil and gas derived products, retail sales of oil products. A network of about 500 filling stations is expected to be developed throughout the Republic of Kazakhstan by 2010.

News