ERP-Service

Not registered?   Почта  

“KazTransOil” project

Duration:

2000-2003 Introduction of Finance, Material Management, Sales, Controlling, Assets. Passing into the production mode.

Development:

2005-2006 Contract Monitoring

2005-2008 – Equipment Maintenance and Repairs

2007-2008 – Personnel Management

2007 – Consolidation of Accounts

2008 – Salary, Project Management, Balanced Scorecard, Optimisation of Divided Accounts, Business Planning

Role in the project:

General Contractor

Functionality:

Finance, Material Management, Controlling, Sales, Asset Management, Contract Monitoring, Equipment Maintenance and Repairs, Personnel Management, Consolidation of Accounts, Salary, Project Management, Balanced Scorecard, Optimisation of Divided Accounts, Business Planning

Project geography:

In all structural branches of the Client, to the exclusion of representative offices in Samara, Omsk, Kiev (cities of Astana, Pavlodar, Shymkent, Karaganda, Aktobe, Uralsk, Aktau, Atyrau, Zhezkazgan, Almaty, Moscow)

JSC «KazTransOil»

JSC «KazTransOil»
19 Kabanbai-batyra Street, Astana

Main activities:
Transportation of oil for exports and to the refineries in Kazakhstan, operation and construction of trunk pipelines

News

15.09.2009

Completion of the project on the ТОРО module replication in the Eastern Branch, JSC “KazTransOil”, down to the level of pump stations, as well as of the second stage of the SAP R/3 system development.

08.09.2009

JSC “KazTransOil” has launched a project on introduction of the management reporting system (MRS). The project was initiated by JSC “Holding Samruk”. The purpose of this project is adjustment of the accounts of National Companies (NC) to single corporate requirements, and receipt of timely and reliable financial and managerial reporting. The first stage will last until June 2010. It is planned to solve the following tasks at this stage: optimisation of balancing and preparation of the JSC “KazTransOil” consolidated accounts, consolidation of financial reporting, intra-company balance reconciliation for an NC group.

01.09.2009

To maintain Business Planning and Divided Accounts, in the beginning of September the distribution of costs, receipts and assets has been completed in accordance with the techniques of the JSC “KazTransOil” half-year divided accounting.