ERP-Service

Not registered?   Почта  

JSC “KazMunaiGas Exploration and Production” Project

Duration:

Introduction into the operation mode (2005 – 2006)

Maintenance and improvements (2007 – 2009)

Role in the project:

General Contractor

Functionality:

Finance, Material Management, Controlling, Sales, Asset Management, Contract Monitoring. Taxation costs are included in the section of subsoil use contracts. The MM module includes a centralised requisition company and the State Reserve formation. The PP module takes into account the boreholel liquid and the use of production orders.

Project geography:

In all structural branches of the Client (cities/villages of: Astana, Zhanaozen, Atyrau, Kulsary, Akkistau, Makat, Dossor, Zhamansor, Sarykamys)

JSC “KazMunaiGas Exploration and Production”

JSC “KasMunaiGas Exploration and Production”
2 Tauelsizdyk Street

Main activities:
Production of oil and gas condensate in Kazakhstan. Is quoted on the London Stock Exchange.

News